Milas, > The pqact.conf file attached is the current one at UTA. Just FYI, I don't need to see the the pqact(1) configuration-file at UTA (the downstream site) because you verified that the desired data-products are not being received. I would like to see the LDM configuration-file at srh-ls-cpnrs1.srh.noaa.gov (the upstream site) so that I can verify that that LDM will allow the downstream LDM at UTA to receive the desired data-products. I would also like to see the LDM log file entries for srh-ls-cpnrs1.srh.noaa.gov around the time the downstream LDM at UTA connects so that I can verify everything went OK. Regards, Steve Emmerson Ticket Details =================== Ticket ID: FOR-229341 Department: Support LDM Priority: Normal Status: Closed