Re: UPDATE on Scheduled DataCenter Power Outage for UPS work
- Subject: Re: UPDATE on Scheduled DataCenter Power Outage for UPS work
- Date: Thu, 3 Feb 2005 08:57:41 -0700
Jerry,
All of the Sun equipment has dual power supplies sharing the load
between the UPS and wall power. When wall power goes out, the UPS
has to pick up that load too which further reduces uptime. We made
it though with 18 minutes of battery remaining.
02/03/05 13:59:22 UPS on battery: Blackout 000.0 V
02/03/05 14:59:40 Normal power restored: UPS on line
You electricians sure are punctual - starting 38 seconds early and
going almost exactly one hour! I'm glad we didn't have to shutdown
though -- thanks for all the assistance.
mike
On Feb 3, 9:46am, Jerrold Robaidek wrote:
> Subject: Re: UPDATE on Scheduled DataCenter Power Outage for UPS work
>
> Hi Mike,
>
> The outage was only about an hour, and it looks like your ups had lots
> of time to spare.
>
> Jerry
>
> Mike Schmidt wrote:
> > Dee,
> >
> > Is the UPS on panel 1 as well? Right now, the UPS is showing a
> > projected uptime of 97 minutes. If the networking is up, we might
> > as well try to hang in there for an hour anyway and then I can
> > initiate a remote shutdown.
> >
> > The original message said a one hour outage and the next one said
> > up to two hours. If all goes well with the electrical work, we might
> > be able to stay up throughout. Comments?
> >
> > mike