Hello Mike, Your machine is on panel one so it will go down when the UPS looses power. You may prefer to have us take it down before the outage, your call. Just let us know asap as we are putting together a plan on who and when will power down machines. Thanks, Dee Mike Schmidt wrote: Hi Dee, Where does unidata2 figure into the panel 1/2/3 scheme? mike On Jan 31, 1:50pm, Dee Wade wrote:Subject: UPDATE on Scheduled DataCenter Power Outage for UPS work It looks like the power outage to panels 1 and 3 in the Data Center (room 649) will occur on Thursday, February 3rd from 8:00 a.m. to about 10:00 a.m. If there are any changes to this plan, we will let you know. Dee Dee Wade wrote:We have been informed that "late next week" (no specific day or time yet available) power to two of the three electrical panels in the Data Center will be down in preparation for the new UPS installation. We have been advised that the outage should be no more than one hour. Only panel two, in the center of the room will retain power. If you are uncertain of where your hardware is connected please contact, nancy, Jerry or myself. As soon as more information is available we will let you know, I just wanted to give this heads-up so you know it is coming. Dee-- Dee Wade Program Manager McIDAS User Services and SSEC Data Center Voice: 608.263.0527 Space Science and Engineering Center Fax: 608.263.6738 University of Wisconsin-Madison 1225 West Dayton Street www.ssec.wisc.edu/mug Madison, WI 53706 www.ssec.wisc.edu/datacenter -- End of excerpt from Dee Wade -- Dee Wade Program Manager McIDAS User Services and SSEC Data Center Voice: 608.263.0527 Space Science and Engineering Center Fax: 608.263.6738 University of Wisconsin-Madison 1225 West Dayton Street www.ssec.wisc.edu/mug Madison, WI 53706 www.ssec.wisc.edu/datacenter |