This archive contains answers to questions sent to Unidata support through mid-2025. Note that the archive is no longer being updated. We provide the archive for reference; many of the answers presented here remain technically correct, even if somewhat outdated. For the most up-to-date information on the use of NSF Unidata software and data services, please consult the Software Documentation first.
CONDUIT data users, There will be intermittant communication outages at NWS tomorrow which will affect data flow. See message below. Steve Chiswell Unidata User Support > Reminder: > > Tomorrow(Wednesday April 6, 2005) at 6:15am EDT (10:15 UTC), the power > capability will be upgraded at the NWS Telecommunications Gateway > (NWSTG Washington, DC). > > The maintenance period is scheduled from 6:15-7:45am > EDT(10:15-11:45UTC). During this time intermittent outages are > expected. > > Please refer to the previous messages for additional details. > > Jackie Lord > > Ph: 301-713-1878 x 126 > Email: address@hidden > > > > "Jacqueline.Lord" wrote: > > Please note that more specific details were added to the affected > > traffic description. > > > > Reminder: > > > > On Wednesday April 6, 2005 at 6:15am EDT (10:15 UTC), the power > > capability will be upgraded at the NWS Telecommunications Gateway > > (NWSTG Washington, DC). > > > > The maintenance period is scheduled from 6:15-7:45am > > EDT(10:15-11:45UTC). During this time intermittent outages are > > expected. > > > > > > Affected Traffic: > > > > As different parts of the power structure are upgraded, outages may > > occur on remote connections and internal links. These outages are > > expected to affect the flow of data. > > > > The Nwsnet firewall and switches will be powered down before the > > start of the power upgrade. Although the PIP router will remain up > > the firewall interface will go down. As a result, there will be no > > communication between the regions and HQ during this time. > > > > Power will be lost to most non-NWSTG communications hardware which > > includes: > > 1. DATMS-U equipment > > 2. Routers installed at NWSTG which are connected to serial lines > > (e.g., T1 lines) > > 3. CSU/DSU equipment > > > > Please contact us if you have any questions, comments or special > > instructions. > > > > Please refer to the previous message for additional details. > > > > Jackie Lord > > > > Ph: 301-713-1878 x 126 > > Email: address@hidden > > > > > > -------- Original Message -------- > > > > On Wednesday April 6, 2005 at 6:15am EDT (10:15 UTC), the power > > capability will be upgraded at the NWS Telecommunications Gateway > > (NWSTG Washington, DC). > > > > The maintenance period is scheduled from 6:15-7:45am > > EDT(10:15-11:45UTC). During this time intermittent outages are > > expected. > > > > > > Affected Traffic: > > > > As different parts of the power structure are upgraded, outages may > > occur on remote connections and internal links. These outages are > > expected to affect the flow of data. > > > > > > Critical Weather: > > > > If the scheduled date is designated a Critical Weather Day, the > > outage > > may be postponed. > > > > > > We apologize for any inconvenience that this outage may cause. > > Please > > contact me if the timing of this outage presents a critical problem > > for > > your operations. > > > > Please forward this message to anyone who will be affected by this > > action but was left off the mailing list. I would appreciate if you > > would send me the email address of anyone that should be informed of > > scheduled downtime in the future, but was not included in the > > current > > list. Also, inform me if you wish to have your name removed from > > this > > list. > > > > Jackie Lord > > > > Ph: 301-713-1878 x 126 > > Email: address@hidden