Hi John,
I have NWP model output data that has been collected from the model as time
series at a single grid point (to make it easy to compare to in-situ time se
ries data). So this is like time series station data. This is from 10 majo
r international agencies for the CEOP project.
I have Forecast data where each day a 72 hour forecast is produced. I want
to be able to select a 24 hour chunk out of each 72 hour forecast to produce
a continous time series of forecast data (e.g. take the data from 12 to 36
hours out of each 72 hour forecast, and concatenate that to produce a contin
ous time series).
Can I do this with a THREDDS server?
Thanks very much,
Ben Burford
JAXA/RESTEC - Tokyo