This archive contains answers to questions sent to Unidata support through mid-2025. Note that the archive is no longer being updated. We provide the archive for reference; many of the answers presented here remain technically correct, even if somewhat outdated. For the most up-to-date information on the use of NSF Unidata software and data services, please consult the Software Documentation first.
Hi Kwan, Sorry for the slow reply, I was not at work today... re: > I am beginning to see the data lost from the newest version of LDM > (6.13.3). I did not see any data lost in version 6.13.2.9 (?). I switched your LDM back to v6.13.2.9 right after seeing your inquiry this morning (and right before heading out of the door). When I got home I noticed that switching back to v6.13.2.9 did not solve the 'Processed oldest product' problem, so I switched you back to v6.11.7. In trying to figure out why your system was not processing all of the CONDUIT products, I did a plot of performance to see if anything jumped out at me: <as 'ldm'> ldmadmin plotmetrics -b 20160724 What I saw was the load average being very high on rainbow during the periods when the 'Processed oldest product' messages were showing up in the LDM log files. We'll see if reverting back to LDM-6.11.7 pushes this problem off for now. If it doesn't, it means that rainbow is simply too overloaded to keep up with processing all of the data that it is receiving via the LDM. Just so you know, we have a machine, lead.unidata.ucar.edu, that is processing a LOT more products than rainbow, and it is not experiencing the 'Processed oldest product' problem and it is running LDM-6.13.2. Cheers, Tom -- **************************************************************************** Unidata User Support UCAR Unidata Program (303) 497-8642 P.O. Box 3000 address@hidden Boulder, CO 80307 ---------------------------------------------------------------------------- Unidata HomePage http://www.unidata.ucar.edu **************************************************************************** Ticket Details =================== Ticket ID: GLG-935498 Department: Support IDD Priority: Critical Status: Closed =================== NOTE: All email exchanges with Unidata User Support are recorded in the Unidata inquiry tracking system and then made publicly available through the web. If you do not want to have your interactions made available in this way, you must let us know in each email you send to us.