[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
FSL Central Facility move schedule
- Subject: FSL Central Facility move schedule
- Date: Sat, 27 Mar 1999 22:18:34 -0700
FSL staff and data users,
The FSL Central Facility will be moved to the David Skaggs
Research Center (DSRC) during the week of April 19. Because of
system and network redundancy, it is expected that the operation
of the laboratory mail and DNS servers will not be interrupted.
However, with a move of this magnitude, possible outages are a
fact of life.
Prior to the Central Facility move, starting early in the week of
April 12, the NOAAPORT NWS Telecommunications Gateway (TG) and
GOES-West data channels will not be available. The NOAAPORT GOES-
East channel will be kept up as long as possible, but not later
than April 20. NOAAPORT data will remain unavailable until the
Satellite Broadcast Network (SBN) antenna is moved from RL-3 to
DSRC by the contractor sometime during the middle of April.
The FSL Mass Store System (MSS) will be taken down on Monday,
April 19.
The data-processing capability of the FSL Central Facility will
stop on Tuesday, April 20.
The FSL server, bora, will go down on Thursday, April 22. This
will impact FSL's home page, anonymous FTP and other lab-wide
services.
It is our goal to have the Central Facility back up by Friday,
April 23.
Please remember that while your division's servers and desktops
are moved, your direct access to mail will not be available.
However, the lab mail server will save your mail messages and
will send them to your division server when it comes up.
In case you have any questions, please do not hesitate to contact
me (X6854, address@hidden), Joan Brundage (after April 5 at
X6895, address@hidden), Network Manager, Brian Moore
(X6289, address@hidden), FD System Administration, Todd
Seemann (X7762, address@hidden).
Thanks,
Peter Mandics
From address@hidden Mon Mar 29 16:08:00 1999
Received: from gatekeeper.fsl.noaa.gov (gatekeeper.fsl.noaa.gov [137.75.1.181])
by unidata.ucar.edu (8.8.8/8.8.8) with ESMTP id QAA17191
for <address@hidden>; Mon, 29 Mar 1999 16:07:59 -0700 (MST)
Organization: .
Keywords: 199903292307.QAA17191
Received: from dilbert.fsl.noaa.gov (address@hidden [137.75.132.102])
by gatekeeper.fsl.noaa.gov (8.9.1/8.9.1) with ESMTP id XAA26906;
Mon, 29 Mar 1999 23:07:58 GMT
Received: from pc416 (pc416.fsl.noaa.gov [137.75.132.38])
by dilbert.fsl.noaa.gov (8.9.1/8.9.1) with SMTP id XAA17532;
Mon, 29 Mar 1999 23:07:57 GMT
Message-Id: <address@hidden>
X-Sender: address@hidden
X-Mailer: QUALCOMM Windows Eudora Pro Version 4.1
Date: Mon, 29 Mar 1999 16:15:22 -0700
To: address@hidden, address@hidden, address@hidden,
address@hidden, address@hidden
From: "Peter A. Mandics" <address@hidden>
Subject: FSL Central Facility move schedule
Cc: address@hidden, address@hidden
Mime-Version: 1.0
Content-Type: text/plain; charset="us-ascii"
FSL LDM data users,
The FSL Central Facility will be moved to the David Skaggs
Research Center (DSRC) during the week of April 19. Because of
system and network redundancy, it is expected that the operation
of the laboratory mail and DNS servers will not be interrupted.
However, with a move of this magnitude, possible outages are a
fact of life.
Prior to the Central Facility move, starting early in the week of
April 12, the NOAAPORT NWS Telecommunications Gateway (TG) and
GOES-West data channels will not be available. The NOAAPORT GOES-
East channel will be kept up as long as possible, but not later
than April 20. NOAAPORT data will remain unavailable until the
Satellite Broadcast Network (SBN) antenna is moved from RL-3 to
DSRC by the contractor sometime during the middle of April.
The FSL Mass Store System (MSS) will be taken down on Monday,
April 19.
The data-processing capability of the FSL Central Facility will
stop on Tuesday, April 20.
The FSL server, bora, will go down on Thursday, April 22. This
will impact FSL's home page, anonymous FTP and other lab-wide
services.
It is our goal to have the Central Facility back up by Friday,
April 23.
Please remember that while your division's servers and desktops
are moved, your direct access to mail will not be available.
However, the lab mail server will save your mail messages and
will send them to your division server when it comes up.
In case you have any questions, please do not hesitate to contact
me (X6854, address@hidden), Joan Brundage (after April 5 at
X6895, address@hidden), Network Manager, Brian Moore
(X6289, address@hidden), FD System Administration, Todd
Seemann (X7762, address@hidden).
Thanks,
Peter Mandics
================================================================
Dr. Peter A. Mandics
Chief, FSL Facility Division
NOAA/OAR/ERL Forecast Systems Laboratory
325 Broadway, R/E/FS2
Boulder, CO 80303-3328
Tel: (303) 497-6854
Fax: (303) 497-7259
E-mail: address@hidden
=================================================================